Structure
|
:
|
R.C.C. frame structure.
|
Brick wall
|
:
|
External wall 150 mm thick. Internal wall 115 mm thick.
|
Flooring
|
:
|
Ceramic tiles in all Rooms.
Ceramic tiles in toilet up to 1.2 Mtr.
Mosac tiles in common area & staircase. Kitchen dado 32” from top.
|
Kitchen otta
|
:
|
Green marble top with Steel sink.
|
Plaster
|
:
|
Internal smooth funty plaster. External smooth funty
plaster.
|
Doors
|
:
|
All Doors shall have R.C.C. Frame & H.D.F. Coated door
in front & all other flush doors.
|
Windows
|
:
|
Aluminium sliding windows with M.S. grill.
|
Plumbing
|
:
|
One tap each shall be provided in kitchen, Bath &
Washing place.
One flushing cock shall be provided in W.C. concealed plumbing.
One shower in Bath. The W.C. shall have one white Orrisa pan.
One wash basin will be provided.
|
Electrification
|
:
|
Each room have 2 light points, one fan point and one plug
point.
There shall be one light point each in bath W.C. & toilet.
One light point shall be provided near common basin.
Power point shall be provided in Drawing Hall & Kitchen.
One Bell point shall be provided.
|
Painting
|
:
|
Putty finish in all inside surfaces with OBD. And external
emulsion paint externally. Doors and frame in oil paint.
|
Parking
|
:
|
Open parking & other amenities as per the sanctioned
plan.
|
Water supply
|
:
|
Through overhead tank & sump.
|
Water Storage
|
:
|
Underground sump and overhead R.C.C tank, separate for
drinking and common use.
|
Power
|
:
|
3/2 bed room will have single phase.
|
Power Backup
|
:
|
Power
backup for common facilities.
|
Terms & Conditions
|
:
|
The rate is exclusive of al I taxes of government and
revision of taxes as applicable.
Instalments are to be paid within 15 days from the date of communication of
the stage.
For delayed payment 24% interest as penalty on the defaulted instalment will
be charged (per annum).
Registration charges (including stamp duty) and other expenses shall be borne
by purchaser.
Electric meter and water meter deposit shall be paid by the purchaser.
All expenses towards electric meter, transformer, water meter, society or any
other Govt body
shall be borne by the purchaser beyond plot boundary.
Deviations from the drawing shall not be entertained strictly.
Period of payment shal I be essence of contract.
Any extra works if done shall be charged extra before execution, as per
actual.
Any dispute arising out of the transaction shall be subject to the exclusive
jurisdiction of the
competent court at Nagpur.
All outstanding payment must be deposited to the builder before taking
possession.
|